Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
High Speed Coffee / tea Double Wall Paper Cup Machine 380V / 220V 60HZ
Specifications:
MODEL |
Paper Cup sleeve machine SHUNDA-80A |
SPEED |
70-80PCS/MIN |
CUP SIZE |
2-16OZ |
MATERIAL |
135-450GRAM |
CONFIGURATION |
ULTRASONIC&HOT AIR |
OUTPUT |
380V/220V,60HZ |
AIR COMPRESSOR |
0.5 M³/Min |
NET WEIGHT |
4 TONS |
MACHINE SIZE |
2500 ×1800 ×1700 MM |
COUNTER SIZE |
900 ×900 ×1760 MM |
FOB SHANGHAI |
32000 USD/SET |
Whole Process
Double wall paper deliver →Double wall Cup forming →Paint Oil on paper bottom→Cup outside Bottom curl→Outside
Cup paint glue inside→Inside Cup drop→Cup tight part→compact the finished cup
Applications:
Produce for Coffee Cup.Paper Cup sleeve.
Machine Details
Introduce
Paper Cup Sleeve Machine each action for paper cup making independent function.The so-called debugging is realizing the function of reservation components in a reasonable, therefore all sales to
Customer equipment, our company has finished debugging already. if there is any place in running the project change, need to be completely familiar with and master the medium-speed charter flights outside the performance, structure, principle, and commissioning.If special circumstances, should contact with the company.
Distribution Box has 1 pcs of Touch screen, 4 pcs of temperature Control device, 2 pcs of indicator light, 6 pcs of button, 1 pcs of rotary Knob , 1 pcs of key, 1 pcs of Electricity Main switch in lateral . Button is : Stop, Main machine stop,Main machine start, Heat start, Heat stop, Alarm stop,Alarm Reset. There is 3 buttons in control handle, the black is inching button, the red is machine stop, the green is Main machine start. in machinery, there is 3 button, 2 pcs of them in front of machine, they control the Bottom paper’s up and down. In back of machine,there is scram button,Now we introduce the every button and its function.
Maintaince Notice
1). Equipment maintenance and maintenance throughout "maintenance and repair is complementary", to do is
Use truly, careful maintenance, make the equipment in good condition;
(2). Must work equipment and machine internal clean up debris and litter;
(3). Responsible for the maintenance personnel should be directly responsible for the equipment are in good condition, must understand equipment performance and principle, troubleshooting and maintenance,
(4) on the automatic lubrication system inspection every week, ensure that all assigned to each and every day oil flow;
(5). Half a month to the machine manual to filling of point injection, to do a good job of lubrication system.Including: gear, bearing, CAM, pendulum pole pin, clip agencies connecting rod, slider mechanism of lubrication.
HAINING CHENGDA MACHINERY CO.LTD [China (Mainland)]
Business Type:Manufacturer
City: Jiaxing
Province/State: Zhejiang
Country/Region: China (Mainland)